BMM Warm up the Crowd at the Theatre

BMM Heaters had the challenge of warming the Georgian Theatre which was built in 1766. Our technical team was faced with a number of issues due to the theatre being a listed building. They quickly found that our standard gas fired warm air heaters were unsuitable due to the heaters requiring large ventilation holes to…

BMM Warm up the Crowd at the Theatre Read More

Olympia Opt for Classics

BMM Heaters have supplied and installed two new 60 kW gas fired two stage Hamworthy Purewell Classic boilers. The boilers were supplied in limited access form, so that the boiler could be carried to the roof top plant room in small manageable parts. Once in position the cast iron sections were joined and tested for…

Olympia Opt for Classics Read More

Exhibiting Quality at Earls Court

BMM Heaters service division service and maintain all the gas fired appliances on site at the Earls Court Exhibition Centre. The gas appliances consisted of air heaters, roof top units, boilers and water heaters. Our installation team installed new ventilation ductwork to an existing Nordair Niche free blowing air handling unit within the Earls Court…

Exhibiting Quality at Earls Court Read More

National Storage Centre Jarrow

BMM Heaters have completed the installation of six high efficient CTUA60 warm air heaters and twenty four energy saving ESF destratification fans. The heating system was designed to heat the storage centre which is 130 metres long x 50 metres wide x 12 metres high to an internal temperature of 18ºc, whilst the outside temperature…

National Storage Centre Jarrow Read More

Warming up the Outlet Store

BMM Heaters supplied two suspended high efficient 22kw air heaters with controls. The heaters are our new compact range which are smaller than our standard suspended heater making them more versatile. The outputs of the compact range from 7kw to 32kw heat outputs make the heater small enough to heat small premises whereas before the…

Warming up the Outlet Store Read More

Warming the Front Room at Butlins

BMM Heaters have designed a suitable heating system and ventilation system for the new front room café bar at the Butlins Skegness site. The building was totally stripped to a bare shell and refitted in a 10 week period; to a very high standard. The system consists of two BMM Heaters tubular gas fired air…

Warming the Front Room at Butlins Read More

Export to Dnepr Warehouse – Ukraine

BMM Heaters had to design a heating system to work at very low temperature due to a frost biting -31ºC. The heater was design to rise the supply air temperature from -30ºC. This was achieved by using a 586 BMG. Seven 586 BMG indirect gas fired heater were supplied with weishaupt new two stage gas…

Export to Dnepr Warehouse – Ukraine Read More

88 BMG Gas fired Heater

Mercat Shopping Centre – Kirkcaldy

BMM Heaters were given the task of designing a gas fired heater to replace eight obsolete gas fired sections. The heaters had to be designed around the existing sizes of the air handling units, internal modifications had to be carried out prior to the installation of the gas fired air heater. The heaters were designed…

Mercat Shopping Centre – Kirkcaldy Read More

293 BMG Gas Fired Air Heater

BMM Heaters are Hungary for Success

BMM Heaters have supplied 21 high turndown gas fired air heaters to the new 190 million euros Bridgestone tyre plant in Hungary, which has been specially designed to produce 8,000 tyres per day for passenger cars and light trucks. The gas fired heaters were specially designed with stainless steel due to condensation caused by the…

BMM Heaters are Hungary for Success Read More

BMM Heaters MUFC

Work Heats up for BMM Heaters With MUFC Contract

Middlesbrough firm BMM Heaters is celebrating the successful completion of a prestigious project worth £52,000 for Manchester United Football Club. The firm, based at the Riverside Park Industrial Estate, was set up by Kevin Myers and Sean Byrne and specialises in servicing and manufacturing industrial and commercial warm air heating systems. The company is unique…

Work Heats up for BMM Heaters With MUFC Contract Read More

Process Heating for Jaguar Plant

Jaguar required a process heating system to dry a wax coating onto their new production line of XK, the wax is applied before delivery to individual dealers to protect the new paint work. The BMM Heater was powered using 110vac due to the specification laid out by the client. The burner enable was done by…

Process Heating for Jaguar Plant Read More