BMM REPLACEMENT FOR GARBUTT HEATERS

BMM Heaters had the task of replacing two Garbutt Heaters with an output of 513 kW, which heated a cash and carry store in Portsmouth.
May 2008

NORTH EAST MANUFACTURER OF THE YEAR AWARD

BMM Heaters Limited attended the North East Business Award Dinner at the Middlesbrough Football Stadium for the second consecutive year.
April 2008

BMM WARM UP THE CROWED AT THE THEATRE

BMM Heaters had the challenge of warming the Georgian Theatre which was built in 1766.
January 2008

OLYMPIA OPT FOR CLASSICS

BMM Heaters have supplied and installed two new 60 kW gas fired two stage Hamworthy Purewell Classic boilers.
December 2007

EXHIBITING QUALITY AT EARLS COURT

BMM Heaters service division service and maintain all the gas fired appliances on site at the Earls Court Exhibition Centre. The gas appliances consisted of air heaters, roof top units, boilers and water heaters.
November 2007

NATIONAL STORAGE CENTRE JARROW

BMM Heaters have completed the installation of six high efficient CTUA60 warm air heaters and twenty four energy saving ESF destratification fans.
October 2007

WARMING UP THE OUTLET STORE

BMM Heaters supplied two suspended high efficient 22kw air heaters with controls.
August 2007

WARMING THE FRONT ROOM AT BUTLINS

BMM Heaters have designed a suitable heating system and ventilation system for the new front room café bar at the Butlins Skegness site.
July 2007

EXPORT TO DNEPR WAREHOUSE-UKRAINE

BMM Heaters had to design a heating system to work at very low temperature due to a frost biting -31ºc.
April 2007

MERCAT SHOPPING CENTRE-KIRKCALDY

BMM Heaters were given the task of designing a gas fired heater to replace eight obsolete gas fired sections.
March 2007

BMM HEATERS ARE HUNGARY FOR SUCCESS

BMM Heaters have supplied 21 high turndown gas fired air heaters to the new 190 million euros Bridgestone tyre plant in Hungary, which has been specially designed to produce 8,000 tyres per day for passenger cars and light trucks.
January 2007

WORK HEATS UP FOR BMM WITH MUFC CONTRACT

Middlesbrough firm BMM Heaters is celebrating the successful completion of a prestigious project worth £52,000 for Manchester United Football Club.
January 2006

PROCESS HEATING FOR JAGUAR PLANT

Jaguar required a process heating system to dry a wax coating onto their new production line of XK, the wax is applied before delivery to individual dealers to protect the new paint work.